IRMA-International.org: Creator of Knowledge
Information Resources Management Association
Advancing the Concepts & Practices of Information Resources Management in Modern Organizations

Case Study on a Maintenance and Reliability Management Model Proposal: A Third Set of Locks Project in the Panama Canal

Case Study on a Maintenance and Reliability Management Model Proposal: A Third Set of Locks Project in the Panama Canal
View Sample PDF
Author(s): Carlos Parra (University of Seville, Spain), Adolfo Crespo Márquez (University of Seville, Spain), Vicente González-Prida (University of Seville, Spain & National University of Distance Education, Spain), Fredy A. Kristjanpoller (Universidad Técnica Federico Santa María, Chile), Pablo Viveros (Universidad Técnica Federico Santa María, Chile), Gabriel Llort (MWH Global, USA)and Alfredo R. Aguilar (MWH Global, Panama)
Copyright: 2017
Pages: 31
Source title: Optimum Decision Making in Asset Management
Source Author(s)/Editor(s): María Carmen Carnero (University of Castilla – La Mancha, Spain)and Vicente González-Prida (University of Seville, Spain)
DOI: 10.4018/978-1-5225-0651-5.ch001

Purchase


Abstract

The purpose of this chapter, is to provide a Maintenance and Reliability Management Model for the project: Design and Construction of the Third Set of Locks in the Panama Canal, with the approach of the process of asset management optimization. A practical vision of the maintenance and reliability management process and framework is presented with the idea of: Structuring the maintenance management process by grouping management activities within a series of so-called management building blocks; Structuring the framework grouping techniques that can be used to support decisions to be taken within each of these building block. This chapter presents not only a process but also the framework and techniques to manage and improve maintenance and reliability effectiveness and efficiency. This report will be used to assist different plant teams to elaborate the optimal strategies for maintenance and inspection for the assets, specified for the project: Third Set of Locks in the Panama Canal.

Related Content

Yu Bin, Xiao Zeyu, Dai Yinglong. © 2024. 34 pages.
Liyin Wang, Yuting Cheng, Xueqing Fan, Anna Wang, Hansen Zhao. © 2024. 21 pages.
Tao Zhang, Zaifa Xue, Zesheng Huo. © 2024. 32 pages.
Dharmesh Dhabliya, Vivek Veeraiah, Sukhvinder Singh Dari, Jambi Ratna Raja Kumar, Ritika Dhabliya, Sabyasachi Pramanik, Ankur Gupta. © 2024. 22 pages.
Yi Xu. © 2024. 37 pages.
Chunmao Jiang. © 2024. 22 pages.
Hatice Kübra Özensel, Burak Efe. © 2024. 23 pages.
Body Bottom