The IRMA Community
Newsletters
Research IRM
Click a keyword to search titles using our InfoSci-OnDemand powered search:
|
An Experiential Case Study in IT Project Management Planning: The Petroleum Engineering Economics Evaluation Software Imperative
Author(s): Charles K. Davis (University of St. Thomas, USA)
Copyright: 2005
Pages: 21
EISBN13: 9781605665108
Purchase
View Sample PDF
Abstract
The case covers key issues in information technology project management. It deals with developing a full set of project plans, including milestones, tasks, schedules, staffing, deliverables, and projected costs, for a complex software development project (Gido & Clements, 2003; Kerzner, 2003; Schwalbe, 2002). The essence of this case is the analyzing of a specific organizational setting with critical software needs and the developing of the needed plans. As in many similar situations, this organization is relatively complex, and the situation is not entirely clear. By reviewing the facts of the case, collecting outside information, conducting role playing interviews, analyzing requirements, and estimating schedules and costs, one can collect the information needed to develop baseline project plans for the software development envisioned in this case.
Related Content
Efrem Mallach.
© 2006.
17 pages.
|
Kenneth David Strang.
© 2010.
17 pages.
|
Muhammad Izhar Mehar, Charles Louis Shier, Alana Giambattista, Elgar Gong, Gabrielle Fletcher, Ryan Sanayhie, Henry M. Kim, Marek Laskowski.
© 2019.
14 pages.
|
Flávio Miranda de Farias, Damián Keller, Victor Lazzarini, Maria Helena de Lima.
© 2015.
20 pages.
|
Abdelkebir Sahid, Yassine Maleh, Mustapha Belaissaoui.
© 2018.
22 pages.
|
|
|